photos

section image
BrowseSearch
Details Results Sort By Collection
 
Viewing Photos 1-5 of 552    
 
G405-02-L.jpg
 
File Name: G405-02-L.jpg Size: 177 KB
Date: 30/03/2007 Dimensions: 1009x672
Description: A zero-emissions head office and visitor centre for one of the world's largest sustainable energy companies, Renewable Energy Systems Limited (RES). The project involved the refurbishment of an existing listed building and used several innovative and energy saving methods to enable RES to generate its own heat and electricity at the site. A zero-emissions head office and visitor centre for one of the world's largest sustainable energy companies, Renewable Energy Systems Limited (RES).
Categories: Hitchin
Collection: Commercial
Quality:
  Required Size:  
TO1203-01-L (Large).JPG
 
File Name: TO1203-01-L (Large).JPG Size: 202 KB
Date: 02/10/2007 Dimensions: 1024x1005
Description: New superstore and petrol station
Categories: Cardiff
Collection: Retail
Quality:
  Required Size:  
TO1200-11-L (Large).JPG
 
File Name: TO1200-11-L (Large).JPG Size: 58.5 KB
Date: 02/10/2007 Dimensions: 768x768
Description: Phase 1 - construction of new sports hall, technology suite including provision of laboratory units to new science block. Phase 11 - construction of new classroom block, music suite and refurbishment of administration block
Categories: Cardiff
Collection: Education
Quality:
  Required Size:  
TO1200-12-L (Large).JPG
 
File Name: TO1200-12-L (Large).JPG Size: 64.6 KB
Date: 02/10/2007 Dimensions: 768x768
Description: Phase 1 - construction of new sports hall, technology suite including provision of laboratory units to new science block. Phase 11 - construction of new classroom block, music suite and refurbishment of administration block
Categories: Cardiff
Collection: Education
Quality:
  Required Size:  
TO1200-01-L (Large).JPG
 
File Name: TO1200-01-L (Large).JPG Size: 66.7 KB
Date: 02/10/2007 Dimensions: 768x768
Description: Phase 1 - construction of new sports hall, technology suite including provision of laboratory units to new science block. Phase 11 - construction of new classroom block, music suite and refurbishment of administration block
Categories: Cardiff
Collection: Education
Quality:
  Required Size:  

Copyright Willmott Dixon 2007
Design by Active Web Solutions Ltd